Abstract:Well-1 of Songliao scientific drilling was designed with depth of 1810 m and finishing drilling in diameter of 157 mm. In this engineering, blowout-preventing facilities were equipped at wellhead by raising platform with self-made under-carrier; lifting capacity was improved by reforming lifting system of TJS-2000E water well rig; coring difficulty was overcome by the development of hydraulic coring equipment; mud solid was controlled by introduced high-speed centrifugation deslimer. Certain tasks in “major geological events in the earth surface system during the Cretaceous and greenhouse climate change” of “973 program” were performed and a feasible way was explored for continental environment scientific drilling with top quality and low cost.
ZHANG Yun-feng , ZHANG Min , HAO Feng
2008, 35(12):6-8.
Abstract:Drilling construction is difficult in complex formation of Zhundong coalfield of Xinjiang with case moving, case broken, borehole wall collapse and borehole deflection. The paper introduced the effective technical measures and operation for complex formation in this mining area with engineering case.
MA Zhong-ping , PANG Hai , WANG Yan-hong , BAO Wei-he , LI Zhen-jie
2008, 35(12):9-11.
Abstract:Geothermal well drilling technique has been developing in recent years in Tianjin area with 4041 m in ultimate depth, 105 ℃ of the highest temperature at wellhead and outlet of 300 m3/h. The article briefly introduced the drilling technology in different geothermal reservoirs, and summarized the experience and lessons.
2008, 35(12):12-14.
Abstract:According to the technical analysis on freezing factors of permanent frozen soil and complex problems in coring borehole, the paper discussed the selection of borehole structure and drilling technology as well as model selection and preparation of cold-tolerance polymer circulation fluid in order to avoid freezing accident in borehole, prevent collapsing, hole shrinkage and leakage caused by thawing from borehole wall endothermic.
2008, 35(12):19-22.
Abstract:The paper discussed some problems in manual monitoring with horizontal displacement borehole inclinometer in deep landslide and the selection of automatic monitoring communication for borehole deep landslide. CZ-2 borehole inclinometer was introduced about the composition and field-testing method.
2008, 35(12):23-25,34.
Abstract:GYD-300 fully hydraulic driving head engineering rig is a model of fully hydraulic driving and driving head reverse circulation. Hydraulic system is operated by electro-hydraulic with integrated structure of cartridge valve. PC monitoring system was used to monitor pressure at the bottom of borehole; according to the monitoring data of different formations to set different drilling pressure, so automatic and manual constant pressure drilling were realized. The paper introduced the rig on its structural feature, experiment and main technical parameters.
CHEN Jing-jing , CHEN Jia-wang , YIN Kun
2008, 35(12):26-27,34.
Abstract:In this paper, flow field inside jet element was simulated with CFD numerical simulation, and the results were analyzed. While with no-load, jet flow attached to and out flowed from one side of the jet element. With different flow to main nozzle, difference of parameters and characteristic of the jet stream is not obvious, so the conclusion is that wall-attached property of jet element is stable with existing structure. This simulation enriched theory of inside flow in jet element and perfected parameter design.
CUI Xue-yu , ZHAO Han-ying , PAN Tao , LI Ming
2008, 35(12):28-34.
Abstract:The excavation for upper inclined shaft of water diversion system of Baoquan Pumped-storage power plant revealed that in the elevation of 668.000~651.000 m and 526.000~514.000 m, the ancient weathering crust was separately drilled through. The rock in ancient weathering crust is rather broken with much slob, bedrock fracture, abundant groundwater and large pervious rate. Grouting of ancient weathering crust becomes the most important step in inclined well excavation, and directly influences the safety and steady operation of pumped-storage power plant.
ZHANG Chuan-feng , CHEN Li-yi , ZHOU Ying-hua , ZHU Shi-qiang
2008, 35(12):35-37,41.
Abstract:The most prominent issue is stability and settlement in embankment construction in the soft soil, so dynamic observation and the settlement prediction is necessary. How to scientifically select the prediction method is a key point. The paper analyzes applicability of some common curve fitting prediction methods to show the more proper selection of prediction method in engineering, in order to effectively control post-construction settlement and guarantee the safety during the embankment construction and operation period.
ZAN Jiang-ming , JI Tie-jun , E Shi-ming , HUANG Xin-feng , NING Jin-sheng
2008, 35(12):38-41.
Abstract:Many practical difficulties were solved by the patent technique for ultra-light well site dewatering in these years, which was applied in a foundation pit engineering to remedy insufficient dewatering of tube well. In local quicksand layer, well tube was obliquely and quasi-horizontally set to realize dewatering and ensure the construction of excavation with compound soil nail support.
LONG Dong , LI Jie , XIANG Jun-wen
2008, 35(12):42-44.
Abstract:With the characteristics of geophysical and horizontal drilling technology and the disbenefit of separate application in the engineering survey sampling, this thesis discussed the advantages of the combinative application of geophysical and horizontal drilling technology in the engineering survey sampling and introduced the design and construction with field case.
WANG Ming-peng , SHEN Xuan-hong , ZHANG Chun
2008, 35(12):45-49.
Abstract:Hangzhou bay sea area is famous for its raging tide with large tide range, fast water flow and complex hydrology condition. Based on the experience of engineering geological drilling at Hangzhou bay bridge, this article introduces the selection of engineering geological drilling technology and platform construction methods in different sea area conditions, and sums up a set of economical, applicable, convenient and safe methods by the analysis.
WU Xiao-en , YANG Ping-yuan , LI Ai-min
2008, 35(12):50-53.
Abstract:Combined with the engineering examples of the retaining and protecting for foundation excavation in Hunan Yunda Internation Square, the difficult problem of the retaining for the foundation was resolved by the use of anchor-pile structure . This article introduced the design for anchor-pile structure of the foundation pit in detail.
2008, 35(12):54-56.
Abstract:Pile foundation of the main tower of palms-together dagoba in Famen Temple was designed for 100 years project service life. The project construction was controlled in alkali-aggregate reaction, borehole completion, sedimentary dregs, cement grouting and post-pressure grouting.
2008, 35(12):57-59.
Abstract:“Skid” often leads to slow drilling footage while drilling in mudstone and hard loess strata with rotary drilling rig, the article analyzed the cause of “skid”, and put forward the technical measures to overcome the “skid” in mudstone and hard loess strata.
2008, 35(12):60-62.
Abstract:Analysis and research were made on the problems in the grouting treatment construction of bauxite goaf under Yudeng expressway, effective technical measure and organizing measure were adopted to guarantee the treatment result.
2008, 35(12):63-65.
Abstract:Application research and construction experience in platform area of south Chengdu showed that deep mixing technology was more suitable for foundation treatment in clay or mud-silty clay. The engineering experience provided the good reference and guidance to the similar deep mixing construction in Sichuan Province.
XIE Bei-ping , DUAN Long-chen , MENG Da-wei
2008, 35(12):67-69.
Abstract:The service life and performance of diamond bits, to a great extent, are determined by the properties of matrix. The research on matrix materials is mainly concentrated in mechanical erosion and downhole flow field at home and abroad without consideration on electrochemical corrosion and synergy of mechanical erosion and electrochemical corrosion to the matrix material. In this paper, according to the experimental demands and conditions, a slurry erosion test platform is designed by the principle of tribology and electrochemical corrosion, and Co-based matrix is chosen as the experimental sample. The results show that erosion-corrosion of matrix material is caused by pure mechanical erosion, electrochemical corrosion and their synergy as well. So corrosion should be taken into consideration for design of matrix material in corrosive condition.
SHEN Cai-hua , LIU Song-yu , TONG Li-yuan
2008, 35(12):70-74.
Abstract:Topology optimization is a high level optimization method of structural optimization, which is a focus study of engineering field. But there is no research achievement in topology optimization of tunnel engineering. In this paper, tunnel model of topology optimization is established; topology optimization analysis on tunnel cavern is made with high-level topology optimization theory; and pre-strengthening support theory is put forward, which is three-layers support combined with primary-supporting and inner lining and strong support on wall rock. The place of pre-strengthening support is found out by the analysis of topology optimization. It shows that this method is reasonable and effective and can be used as reference in the construction and design of road tunnel.
LI Wen-tian , LIU Ye , LIU Ze-qi
2008, 35(12):75-77.
Abstract:Mud-filled fracture has large influence to blasting construction. Analysis and discussion were made on the influence to blasting construction in mud-filled fracture according to the experience of blasting construction in Jiangyunding tunnel, and the countermeasures were also put forward.
2008, 35(12):78-83.
Abstract:Analysis was made on construction safety and construction risk in large cross-river shield tunnel engineering in full detail. And comprehensive discussion was also made on the construction safety and risk management with field cases and experience.