CHEN Guo-zheng , CHEN Shou-ping , CHEN Shou-an
2007, 34(2):4-9.
Abstract:Because of the ground subsidence, a 3-storeyed masonry-concrete building became dangerous with southeast inclination. Static pressure pile underpinning was used to reinforce the foundation. After consolidation, the design, construction and test of two-direction rectification by jack-up were made, and it was proved successful. The design and construction of rectification of deviation were introduced.
2007, 34(2):10-12.
Abstract:In order to deal with the difficulties in hole completion and resolve serious leakage in pebble and bedrock, we use hydraulic grab as drilling equipment, adopt rational mechanical structure, drilling method, mud prescription in rectangular section pile construction.
2007, 34(2):13-15.
Abstract:Based on the case analysis on pre-stressed tubular pile construction in Shantou district in these years, according to the characters of engineering geological condition and working experience, some discussion on design and construction of pre-stressed tubular pile are made.
CHEN Chun-hua , YANG Quan-zhong
2007, 34(2):16-18,24.
Abstract:通过在郑西客运专线的工程勘察中获得的工作经验,针对现在工程建设中工程勘察长期存在的一些主要问题进行了讨论,并提出了解决这些问题的一些思路和方法。
2007, 34(2):19-21,24.
Abstract:静压法桩基施工前景广阔,但在烟台滨海平原地区应用较少。结合烟台市安泰创业园综合楼工程,从工程地质条件入手,论证了静压法桩基施工适宜于烟台滨海平原地区,重点介绍了该工程静压法桩基施工工艺。
2007, 34(2):22-24.
Abstract:某石油公司二联合装置部分区域的设备基础出现不均匀沉降,严重影响整个装置的正常生产,经采用袖阀管注浆对其地基加固后,达到稳定的目的,保证了整个装置的安全运行。介绍了该工程加固施工技术。
2007, 34(2):25-27.
Abstract:介绍了杭州湾跨海大桥桩底压浆施工工艺,通过静载和动载两种不同的桩基试验方法,验证了桩底压浆施工对提高单桩承载力的效果。
2007, 34(2):28-30,34.
Abstract:结合新长铁路二期工程的施工实践,介绍采用袋装砂井、砂垫层、土工格栅综合加固软土地基的原理、施工工艺、质量检查以及几点体会。
2007, 34(2):31-32,44.
Abstract:结合鞍山东方大厦工程实例介绍了土钉支护技术的设计和应用。实践证明,土钉支护技术在粉质粘土和粉土以及砂质土层中具有性能可靠、施工简便和造价低廉等优点。
2007, 34(2):33-34.
Abstract:通过对河南方山煤矿回填矿渣挡土墙滑移原因的分析,提出了板桩墙和削坡相结合的处理措施,既经济,又有效的处理方案,对该类挡土墙事故处理具有参考价值。
2007, 34(2):35-36.
Abstract:介绍了DX挤扩灌注桩技术的基本原理、适应范围以及实现该技术使用的施工设备,并通过工程实例介绍了DX挤扩灌注桩的施工工艺和技术要点,提出了施工过程中应注意的几点事项。
2007, 34(2):37-39.
Abstract:通过结合德国宝峨BG-15型旋挖钻机在广东中海壳牌南海石化输油码头嵌岩桩工程和三一重工SR-200型、北京经纬巨力ZY-200型旋挖钻机在西安市大兴路立交桥梁工程S1标桩基工程中的施工应用情况,分析并与传统的钻进工艺相比,旋挖钻机在工艺、性能、经济和环境保护方面的优势,并就施工中常见问题及解决方法进行了总结,以使旋挖钻机能更好地发挥其优势。
2007, 34(2):40-44.
Abstract:Based on the purpose of gas geological drilling and non-equilibrium drilling theory, the paper summed up the gas geological drilling technology, and the related technological measures, and emphasized the safety construction.
MA Zhong-ping , DU Bin , BAO Wei- he , LI Hui-juan , WANG Yan-hong
2007, 34(2):45-47.
Abstract:Acid-fracture technology is a kind of effective measure for high and stable oil production, and is a stimulation technology used in oil and gas layer. According to the geothermal well construction experience for years, acid-fracture technology can also be used in carbonate bedrock fracture geothermal well as an effective stimulation measure. The paper introduces the application of this technology in geothermal well WR95.
2007, 34(2):48-50.
Abstract:详细介绍了广东某盐井水平定向对接的钻井技术,包括井身结构、钻井参数、泥浆技术、地质工作、固井以及各分段的具体施工技术。
2007, 34(2):51-52,54.
Abstract:针对舞阳县盐矿区JS6与JS5水平定向井的施工,介绍了盐矿区水平连通对接井的施工工艺措施和施工技术,并指出了施工中需要注意的问题。
2007, 34(2):53-54.
Abstract:红花尔基煤盆地辉河以北矿区钻孔漏失严重,钻探事故频繁发生。介绍了在实践中总结出的一套针对该地层行之有效的钻孔堵漏施工技术,效果十分显著,成本大大降低,减少了孔内事故率。
2007, 34(2):55-56.
Abstract:内蒙古锡林郭勒盟芒来煤矿区在钻进过程中由于泥岩、碳质泥岩中粉土膨胀,水化分散,易发生提下钻困难、泥浆粘度增大、成孔后测井困难等原因。下钻扫孔还极易造成钻孔偏离原孔位,使得钻孔报废,从而使钻进效率低下,影响施工进度。应用钙处理泥浆取得了明显的效果。
2007, 34(2):57-59.
Abstract:It is very difficult to support the coalmine soft-rock tunnel.This paper theoretically analyzes the mechanism of truss bolt system, and gives the design of coal roadway support according to the characteristics of the "Three-soft" coal roadway.Good supporting effect was achieved by test.
2007, 34(2):61-62.
Abstract:通过改进施工机具,优化施工工艺,实现巷道掘进后的快速支护,取得了良好的经济效益和安全效果。