ZHAN Long-he , JIN Ke-bai , XIE Qiu-ming
2004, 31(10):1-3.
Abstract:The main peculiarities, the engineering difficulties, and the chief technical countermeasures of bored pile drilling for Wenzhou World Trade Center were introduced. The relative treatments and points for attention to drill deep pile hole in intermediary weathering remain rock body were also mentioned.
2004, 31(10):4-5.
Abstract:泵吸反循环在120 m超深桩孔的成功应用,在国内尚属首例。从理论上分析论证了泵吸反循环在超深桩孔中运用的可行性,并通过积极探索和实践获得了成功,在泵吸反循环施工方面取得了新的突破。
2004, 31(10):6-8.
Abstract:介绍了滚刀钻头在温州世贸中心大厦桩基工程中的应用情况,阐述了镶齿、焊齿两种滚刀钻头适应的地层和各自耐磨情况,并对各自的优缺点进行了分析、对比。
2004, 31(10):9-9,8.
Abstract:针对温州世贸中心大厦钻孔灌注桩工程中风化残留体施工难度大、桩孔深的特点,设计制作了筒状内锥三翼钻头,实践证明这是处理中风化残留体的一种行之有效的办法。详细阐述了该钻头的设计制作和施工效果。
2004, 31(10):10-11,19.
Abstract:介绍了温州世贸中心大厦钻孔桩的格构柱桩的施工难点和特点以及在施工中采取的主要技术措施。
2004, 31(10):12-14.
Abstract:介绍了温州世贸中心大厦钻孔灌注桩施工的现场管理、组织管理,详细阐述了施工准备、施工组织、质量控制、安全管理、文明施工等各方面的内容。
FU Gang , XIONG Zong-xi , QIN Pei
2004, 31(10):15-19.
Abstract:Beijing Subway Line Five cross from north to south of the city. The conventional dewater methods are limited to use, even can not be used in some area. The radialized well dewater methods not only resolve the problems and get good results, but also developed a new way to dewater the underground project. The technical principle and requirement of radicalized well, problems encountered and their countermeasures, suggestions were introuduced.
2004, 31(10):20-23.
Abstract:The fast method of soil consolidation test and the amending formula for the data of the results were introduced. Contrast analyses between the coefficient of compressibility (a′1-2) of the quick method and the coefficient of compressibility (a1-2) of the common method was made based on project cases.
2004, 31(10):26-26.
Abstract:在北京三一产业园工程中采用了CFG桩与碎石桩复合地基新技术,尤其为适应消除地层液化和承载力设计需要,又为了便于施工,采用了CFG桩与碎石桩相间的布桩方案,既消除地层的液化,满足了承载力的要求,又节约了投资,实践证明这是一种既安全可靠又经济实用的方法。还对复合地基的设计计算进行了专门讨论。
2004, 31(10):27-28.
Abstract:应用注浆加固理论,通过对地质条件的分析认识,利用注浆托换技术对贵州省都匀市某监狱习艺楼在建工程进行地基处理,达到了增层加载的目的。
2004, 31(10):29-31.
Abstract:从静压桩施工前应注意的问题及施工中的质量控制两方面介绍了确保静压桩施工质量的措施。
2004, 31(10):32-32,38.
Abstract:山东德州某地热资源应用示范工程建筑物基础采用沉管灌注桩,设计单桩承载力标准值850 kN,实测仅为650 kN,不能满足设计要求,分析了承载力不足的原因,提出了几点改进建议。
WANG Zhi-ming , YIN kun , ZHENG Zhi-chuan
2004, 31(10):33-35.
Abstract:Hydro-pneumatic Suspensions system is well both in non-linearity elasticity and damping capability. It can greatly improve the performances of suspension systems. The paper introduces Hydro-Pneumatic suspensions technique and application actuality, and then indicates it is very important to develop the special type mobile machinery such as Hydro-pneumatic suspensions system.
LI Bing , NING Fu-long , GUAN Jin-an , JIANG Guo-sheng
2004, 31(10):36-38.
Abstract:The performances of datum acquisition card PCI-1711 were introduced. Taking gas hydrate experiment datum collection as an example, the datum collection method and equipment controlling by PCI-1711 was explained.
XIA Hong-nan , WANG Xiao-jian , DAI Jun , OUYANG Yong , TAN Jia-hu
2004, 31(10):39-42.
Abstract:Eccentric BHA is a new deflection controlling tool. It’s difficult for us to analyze the stress of eccentric BHA. The paper probed into the theory model of it. The eccentric BHA based the theory model was carried out field testing in Liaohe Oil Field. Good results have been gotten. Borehole deflection was controlled and high penetration rate was also kept.
2004, 31(10):43-45,50.
Abstract:Developing and taking advantage of geothermal resources is a systematic project of high investment. Several drilling techniques for decreasing investment and increasing development benefit of geothermal resources were approached after analyses on current situation of geothermal resources development in Daqing Oilfield. Well structure optimization techniques, horizontal drilling techniques and branch hole drilling technology have great potential application on developing different hot water zone. The new way to use the clear energy of geothermal energy is also approached. The main attentions put on the well structure optimization of Well Sare 2.
XIE Jun-qing , HU Zhong-li , LI Yu-cheng
2004, 31(10):46-50.
Abstract:Experience and lessons, from diamond wire line core drilling, primary directional drilling and borehole wall protection, for solving the problems of severe deviation, extremely low core recovery, borehole leakage and cave-in, were introduced. Some experiences of exploration drilling for large mine were summarized out.
2004, 31(10):51-52.
Abstract:简要介绍了洛阳市复杂的地质构造和岩性,详述了地热井设计及施工工艺,总结了洛阳市复杂地质条件下施工的经验和存在的问题。
2004, 31(10):53-55.
Abstract:结合工程实例,对螺杆钻定向钻进技术应用于处理事故孔时的设计、施工进行了详细阐述。特别对螺杆钻在造斜钻进时的钻进工艺、形成分支孔时采取的技术措施进行了总结。
2004, 31(10):56-57.
Abstract:栾川冷水北沟铅锌银多金属矿区设计的ZK2701定向孔,是在河南省固体矿产地质勘探中首次采用受控定向钻探技术施工的钻孔,探讨总结了以螺杆钻完成受控定向钻探技术的操作方法、计算方法及采取的主要技术措施。
LIU Yong , LIU Yu-yuan , WANG Shu-liang
2004, 31(10):58-60.
Abstract:The support methods for deep stress tunnel and their supporting results were analyzed on the basis of actual engineering cases. Several support types and their combinations were compared. Afterwards the supporting strategy may be used in the area was put out.
2004, 31(10):61-62.
Abstract:论述了湿喷钢纤维混凝土的作用原理及在马鞍山采石翠螺山人防隧洞工程中的应用情况。