2000(6):3-6.
Abstract:Karst and its distribution are described. Mineral resources, water resources and geologic and environmental hazards in the karst area are analyzed. The drilling features in the karst area are meanwhile expounded, and its future is looked into.
2000(6):7-8,11.
Abstract:通过对山西晋中地区的湿陷性黄土进行的钻孔、探井对比勘察试验,用相关性分析方法,得到了钻孔、探井土样天然重度的回归方程,解决了钻孔土样天然重度资料的合理使用问题。
2000(6):9-11.
Abstract:This paper makes a thoroughly study on the behavior of base grouted pile in vertical loading by FEM. The grouting effect and mechanical character of based grouted pile in varied loading term and analyzed. Some conclusions relating to the base grouted pile are obtained from simulating the influence of several factors.
2000(6):12-14.
Abstract:This paper discusses the factors, which affect the solid liquid separation of mud through typical experiments based on the orthogonal theorem. The results indicate that the factors affecting coacervation come out by the following order of degree: type of coacervating agent, concentration of mud, input amount, mixing duration. The methods of selecting the mud type and the problem should be paid attention are pointed out.
2000(6):15-16.
Abstract:通过计算泵吸反循环工况下沿程各项水头损失,分析其压力平衡条件,进而探讨泵吸反循环施工100m深孔的可行性,并介绍了武汉白沙洲长江大桥2号主墩桩基工程采用泵吸反循环施工102m深桩孔的工程实践和采取的技术措施。工程取得良好效果,充分证明泵吸反循环施工100m大口径深孔是完全可行的。
2000(6):17-19.
Abstract:根据数十项工程实践经验,在分析目前岩溶地区桩基施工存在问题及原因的基础上,对岩溶地区桩基工程中的场地工程地质勘察、桩型选择以及施工工艺、缺陷处理等问题进行了详细的论述和归纳总结。
2000(6):20-22.
Abstract:在岩溶发育地区施工冲击成孔灌注桩,曾发生桩孔弯曲、漏失、串通、孔壁坍塌、锤头脱落或被卡等事故,分析了事故原因,总结了防治措施。
2000(6):23-23,25.
Abstract:叙述了射水造墙新工艺及适用范围,介绍了在九江长江大堤防渗工程中进行射水造墙的施工设备、工艺流程及造孔、灌注砼、孔与孔连接技术,工程结束后,大堤再未出现泡泉和管涌。
2000(6):24-25.
Abstract:广东岭澳核电站联合泵站施工围堰深水填筑,采用高压旋喷法防渗。介绍了工程概况、围堰设计和注浆施工。并通过计算分析和现场试验证明防渗设计和施工是成功的。
2000(6):26-27.
Abstract:大连益远港口船坞基地管理工程,由于坞址基础岩石为石灰岩,地质复杂,岩石裂隙发育,岩溶分布较多,坞室底板水下压浆混凝土工程浩大,此项工程在国内尚属首例。通过坞底铁矿石压浆混凝土原型试验来确定符合工程实际的参数,并为今后在该类地层设计与施工积累资料。
2000(6):28-28,30.
Abstract:在武汉长江广场钻孔灌注桩工程中,由于工程地质条件的特殊性和水深、孔径大,用正循环法和反循环清渣难以满足规范要求,引进气举反循环清渣方法,效果良好。介绍了气举反循环清渣的工作原理及所需压气量的计算方法。
2000(6):29-30.
Abstract:分析了西班牙镗铣床在加工工件时产生精度误差的原因,确定出相应的治理地基病害的方案。从桩孔布设、设备保护措施、质量保证等方面作了全面的阐述。
2000(6):31-31.
Abstract:分析了米家塬大桥桩基施工中,发生埋钻事故的原因,介绍了气举法在事故处理中的应用,对处理类似事故有借鉴作用。
2000(6):32-32.
Abstract:随着我国煤炭事业的发展 ,老矿区的后备储量已日渐减少 ,为延长矿井的服务年限 ,矿井外围扩勘尤为必要。老矿扩勘项目往往煤层埋藏较深 ,施工的钻孔较深 ,施工周期较长。由于钻孔弯曲 ,拉槽卡钻现象时有发生 ,严重地威胁着钻孔的正常施工 ,有时还会造成钻孔的报废 ,经济损失较大。我们除在施工中采取各种防斜措施外 ,还采用了破槽接头 ,避免拉槽形成。1 破槽接头的设置及结构随着钻孔的延深 ,逐渐加入粗径钻具 (钻铤 )。当加入的粗径钻具的重力超过孔底所需压力的 2 0 %时 ,可加入钻杆 ,在钻杆上每隔 2 0
2000(6):32-32.
Abstract:在高压注浆施工中 ,注浆结束时水泥浆流动阻力很大(一般为 5MPa) ,液压系统工作压力很高 ,大量液压油经旁路流回油箱 ,换向阀处于 0位。这时 ,重新启动 ,便会出现电机、油马达转动 ,而液压缸不运动 ,发生“死机”。这是设备安全保护装置发生作用的结果。必须卸下位于换向阀端盖中心的堵丝 ,用钢筋棍窜动阀心 ,再拧好堵丝 ,才能正常作业。实际施工中无论是注浆终止还是堵管事故 ,都会发生“死机”。上述操作既浪费时间和油料 ,又不方便。于是我们尝试用液化气管道中的截止阀 (气门开关 )替换堵丝 ,发生“死机
2000(6):33-33,46.
Abstract:粉喷桩施工一般采用连接喷粉、搅拌的方法,但当施工中遇到硬夹层时就必须酌情处理,某高速公路路基软土处理施工中,采用分段喷灰、分段复搅工艺取得了较好的效果。
2000(6):34-36.
Abstract:The expert system is one of the most important and most active branches of the AI field. It is very significant of its application in the mechanical design to drive the mechanical design process to advance in the automatic and AI direction. Some problems with the study on the drill rig design expert system are reviewed. The main objects and tasks of the drill rig design expert system and their realized methods are discussed. The study is also made on the knowledge presentation; knowledge acquisition and knowledge derivation method proper for the requirements of the drill rig design expert system.
2000(6):37-39.
Abstract:介绍了以Auto CAD为开发平台的地勘牙轮钻头专用CAD软件系统的开发及其应用。该系统由参数设计、布齿设计、参数化绘图3部分组成,可采用菜单、对话框和图标等形式对地勘牙轮钻头进行计算机辅助设计。在参数选取后进行布齿设计,然后进行参数化绘图,分别绘制出牙掌图、牙轮图和其它零件图,最后绘制装配图。
2000(6):40-42.
Abstract:The effect of the bearing travel clearance on the drill in the operations is analyzed. It is proposed that a disc spring pre tightening device be fixed on the outer end of the taper roller bearing of the output shaft of the drill, which effectively eliminates the bearing travel clearance.
2000(6):43-44.
Abstract:The machining of the heavy duty thrust bearings for construction and water well drill rigs is difficult due to quenching and deformation. The quenching process of the bearing is examined with the main causes of quenching deformation. A special easy quenching press is designed to modify the quenching process, reduce the deformation of the bearing ring, and improve the manufacturing quality.
2000(6):45-46.
Abstract:大口径深孔使用组合牙轮钻头存在一些问题,对钻头结构加以改进,并采用多点扶正、宝塔式钻具结构、满眼钻进,尽可能采用气举反循环钻进,采用优质低固相泥浆,保证足够的钻压及合理的转速,取得了较好的效果。
2000(6):47-50.
Abstract:The paper summarizes and discusses the failure types and failure mechanism of collar connection thread in detail. The possible factors that exist in oilfield site and may affect the connection thread have been pointed out. At the same time, the paper shows the causes that FH thread and IF thread should be abandoned.The number NC thread connection is been advised to use in all oilfields in China.
2000(6):51-53.
Abstract:The general karst development law in the central Hunan is introduced. The methods to resolve borehole circulation loss using karst development law are recommended. Case study is made.
2000(6):54-55.
Abstract:总结了在隐伏碳酸盐岩地层施工岩溶井的钻井工艺。着重介绍了碳酸盐岩地层的钻进方法长取粉管钻具及限量供水钻井方法,以及采取爆破压裂技术洗井扩大出水量等,效果显著。
2000(6):56-57.
Abstract:结合水井施工中存在的问题及施工经验,提出降低成本、提高效益的改进措施尽量采用较大口径开孔,然后争取一套技术管到达目的层,将原“小径打大径扩”的施工工艺改变为“一径开”;改善泥浆的净化系统。这些措施得到了推广应用,取得了明显的经济效益。
2000(6):58-59.
Abstract:从实践应用的角度出发,针对成井质量和“水进砂进”问题,阐述了在粉细砂地层中成井,应如何进行有关技术手段的配套和关键环节的把握,并对此作出了一些有益的探讨。
2000(6):60-61.
Abstract:神华集团活鸡兔矿井主采2-2煤层上部存在巨大“烧变”岩储水体,严重威胁着矿井的安全生产。通过勘测设计,并精心组织施工,在矿井投产前将矿体上部水量泄排到满足矿井安全生产的要求。介绍了泄水孔施工工艺,并谈了几点体会。
2000(6):61-61.
Abstract:国家探矿工程机械质量监督检验中心 ,具有国内领先水平的 3个专业性试验台 :泥浆泵试验台用于测试 75kW以下地质钻探用泥浆泵整机性能 ;地质岩心钻机试验台用于测试10~ 75kW地质岩心钻机整机性能 ;水文水井工程钻机试验台用于测试 10~ 75kW水文水井钻机、工程钻机等多种类型钻机的整机性能。该中心经过国家技术监督局审查认可和计量认证 ,严格按照产品标准进行检验 ,测试数据准确、可靠 ,提交的检验报告具有权威性。转矩测量在钻探设备性能检验中占有重要的地位 ,它是判定被检产品质量水平的重要参数。为了保
2000(6):62-63.
Abstract:介绍了H350型气动夯管锤铺设50m长、824mm排污管的施工实例。根据铺管要求和现场勘察资料,设计采用先施工导向孔,再实施夯管锤铺管的工艺方法,并采用管外泥浆以减少地层对管壁的摩擦阻力。详细论述了设备安装及夯管铺管过程,分析了夯管距离对夯管速度的影响。
2000(6):64-67.
Abstract:简述了发生于6500万年以前的墨西哥奇克休罗伯陨石撞击构造于90年代通过浅孔钻探揭示证实的过程;介绍了列入国际大陆科学钻探研究项目的重要意义,拟解决的基本问题和实施计划,包括深孔钻探孔深、孔位的确定和项目的组织实施等。