Exploration and practical analysis of drilling construction technology for shale gas investigation wells in Xinjiang
CSTR:
Author:
Affiliation:

Urumqi Geological Party Xinjiang Bureau of Geology, Xinjiang Urumqi 830002, China

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Xinjiang, as a region in China with enormous potential for shale gas (and hydrocarbon) resources, presents severe challenges to drilling construction processes due to its complex geological conditions, such as deep-seated shale formations and strongly water-sensitive shale. Drawing on the drilling practices of small-diameter geological survey wells, taking Well Ye 2 as an example, this paper systematically analyzes optimized drilling technology solutions suited to this region. These solutions encompass key technologies including equipment selection, drill bit selection, deviation control and straight-hole drilling, drilling fluid management, lost circulation prevention, and intelligent monitoring. Through on-site practical verification, the optimized drilling processes have significantly reduced the rate of complex accidents and enhanced drilling efficiency, thereby providing technical support for the cost-effective and efficient development of shale gas in Xinjiang. Looking ahead, further research is needed to tackle the challenges of low-cost and intelligent drilling technologies to meet the demands of large-scale development.

    Reference
    Related
    Cited by
Get Citation
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 05,2025
  • Revised:July 17,2025
  • Adopted:August 04,2025
  • Online: October 27,2025
  • Published:
Article QR Code