1.Kunming Center of Natural Resources Survey, China Geological Survey, Kunming Yunnan 650000, China;2.Yunnan Land and Resources Vocational College, Kunming Yunnan 650000, China
Clc Number:
P634
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
With the increasing demand for mineral resource exploration in recent years, the depth of core drilling and the complexity of strata have been increasing, leading higher requirements for controlling the trajectory of drill holes in order to accurately drill into the ore bodies and achieve geological objectives. This paper introduces the construction overview of the Z2901 drill hole at the Chan’an Gold Mine, and addresses a series of technical difficulties such as wall collapse, rock falling, broken drill accidents, borehole enlargement, trajectory control, and core sampling in complex strata. It summarizes the experience of construction of large-angle geological core drilling, provides technical references for the construction of large-angle geological core drilling.