Application of full hydraulic drilling rig in shale formation drilling construction
CSTR:
Author:
Affiliation:

Urban Geological Survey and Monitoring Institute of Hunan Province, Changde Hunan 415000, China

Clc Number:

P634.3+1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In the detailed investigation project of talc mine in northwestern Hunan, modular full hydraulic drilling rigs were used for drilling construction, penetrating multiple layers of shale and mudstone formations, and breaking rocks. This paper analyzes various technical problems encountered during the drilling construction process, such as drilling rig capacity, flushing fluid, and borehole annular gap, and proposes countermeasures, which have a certain reference value for the construction of similar mining areas.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 22,2024
  • Revised:August 03,2024
  • Adopted:August 06,2024
  • Online: November 08,2024
  • Published:
Article QR Code