Study and application of drilling fluid system for strong plugging and collapse prevention in multi-branch wells of Zhangji Coal Mine
CSTR:
Author:
Affiliation:

1.The First Exploration Team of Shandong Province Coalfield Geology Bureau, Qingdao Shandong 250013, China;2.Beijing Sanhe Runjing Technology Co., Ltd., Beijing 102240, China

Clc Number:

P634.6

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Zhangji coal mine multi-branch well is a drilling project of 1 straight 5 branch wells deployed to find out the geological (collapse column, thin coal belt and graben, etc.) and hydrogeological characteristics of No.3 abnormal area.The main target layers of T3 hole are 3up and 3down coal seams, which have low mechanical strength, developed fractures and cleats, poor homogeneity and high shear stress. The wellbore of coal seam section is extremely unstable, and it is easy to cause wellbore collapse, lost circulation, stuck or even buried wellbore during drilling. By analyzing the main technical difficulties of drilling fluid operation, the polymer drilling fluid system for strong plugging and anti-sloughing of multi-branch wells is developed. The main formula is: base slurry+0.5%KPAM+1%ammonium salt +1%potassium humate+1%filtrate loss agent+1% anti-sloughing agent+3%NS plugging agent, viscosity 35~50s, density 1.05~1.2g/cm3, water loss 4~6mL. One main hole and five branch holes were drilled, drilling quantity was 2506.23m, hole formation rate was 100%, core recovery rate was 92%, which ensured the requirements of construction.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 26,2024
  • Revised:April 28,2024
  • Adopted:May 15,2024
  • Online: November 08,2024
  • Published:
Article QR Code