4/13/2025, 8:06:20 PM 星期日
Research and application of key technologies for new low fault top drive
CSTR:
Author:
Affiliation:

1.Anhui Deep Drilling Engineering Research Center, Hefei Anhui 230051, China;2.Hebei Yongming Geological Project Machinery Co., Ltd., Xingtai Hebei 055150, China;3.Anhui Technical College of Industry and Economy, Hefei Anhui 230051, China

Clc Number:

P634.3;TE922

  • Article
  • | |
  • Metrics
  • |
  • Reference [18]
  • |
  • Related [20]
  • | | |
  • Comments
    Abstract:

    Aiming at the problems of complex structure and high failure rate of traditional top drive rigs, a new top drive system suitable for 4000m drilling rigs was developed. The new top drive uses a permanent magnet synchronous motor to drive spindle rotary drilling directly, and the water cooling technology is used for motor cooling. Compared with the traditional top drive, the new top drive lays out the hydraulic station on the ground, while eliminating the gearbox, lubrication pump station, cooling fan and other components at the same time, so that the number of parts reduced by more than 45% The lifting ring is directly connected with the motor housing, and the main bearing is placed inside the motor rotor, which reduces the size of the top drive and reduces the number of main loaders.The guide rail structure has been optimized to improve the convenience of operation. The new top drive has the advantages of simple structure and low failure rate. It has been applied in more than 20 wells in the field, which has verified its reliability and increased the operation efficiency. The new top drive can be widely used in oil and gas drilling and workover, geological exploration, shale gas and coal seam exploration and other fields, and has a good market application prospect.

    Reference
    [1] 胡向阳,李东,张笃昌,等.XD-10DK型小口径电动顶驱钻机的研制与应用[J].钻探工程,2022,49(6):87-95.HU Xiangyang, LI Dong, ZHANG Duchang, et al. Development and application of XD-10DK small diameter electric top drive drill[J]. Drilling Engineering, 2022,49(6):87-95.
    [2] 沈怀浦,何磊,黄洪波,等.适用于大深度地质钻探和油气地热钻井的双动力电顶驱系统设计[J].探矿工程(岩土钻掘工程),2020,47(4):31-39.SHEN Huaipu, HE Lei, HUANG Hongbo, et al. Dual-power electric top drive drilling system design for large-depth geological drilling and hydrocarbon & geothermal drilling[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2020,47(4):31-39.
    [3] 刘凡柏,高鹏举,任启伟,等.4000 m交流变频电驱岩心钻机的研制及其在地热井的工程应用[J].探矿工程(岩土钻掘工程),2018,45(10):40-46.LIU Fanbai, GAO Pengju, REN Qiwei, et al. Development and application of 4000m AC frequency-conversion core drill[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2018,45(10):40-46.
    [4] 步卫玲.国外钻机顶部驱动钻井装置的发展趋势[J].石油机械,2009,37(6):88-90.BU Weiling. Development trend of top drive drilling equipment in foreign drilling RIGS[J]. China Petroleum Machinery, 2009,37(6):88-90.
    [5] 郭晓霞,李磊,周大可.2020国外油气钻井技术进展与趋势[J].世界石油工业,2020,27(6):55-60.GUO Xiaoxia, LI Lei, ZHOU Dake. Development and trend of foreign oil and gas drilling technologies in 2020[J]. World Petroleum Industry, 2020,27(6):55-60.
    [6] GB/T 31049—2014,石油钻机顶部驱动钻井装置[S].GB/T 31049—2014, Top drive drilling unit of oil drilling rig[S].
    [7] 陈朝达.顶部驱动钻井系统[M].北京:石油工业出版社,2000.CHEN Chaoda. Top Drive Drilling System[M]. Beijing: Petroleum Industry Press, 2000.
    [8] 冯琦,郭永岐,桑峰军.典型顶部驱动钻井装置结构与功能分析[J].石油矿场机械,2013,42(9):90-93.FENG Qi, GUO Yongqi, SANG Fengjun. Structure and function analysis of a typical top-driven drilling unit[J]. Oil Field Equipment, 2013,42(9):90-93.
    [9] 春刚.National-Oilwell公司顶驱研制近况[J].石油机械,2000(5):45.CHUN Gang. Recent development of top drive in National Oilwell[J]. China Petroleum Machinery, 2000(5):45.
    [10] 蒋谊,陈俊,王信军,等.新型直驱式顶部驱动钻井装置[J].石油机械,2011,39(7):56-58,7.JIANG Yi, CHEN Jun, WANG Xinjun, et al. A new direct drive top drive drilling device[J]. China Petroleum Machinery, 2011,39(7):56-58,7.
    [11] 田玉栋,柳贡慧,齐悦,等.新型小型化顶驱关键技术研究与应用[J].钻采工艺,2022,46(1):115-119.TIAN Yudong, LIU Gonghui, QI Yue, et al. Research and application of key technologies for novel miniaturized top drive[J]. Drilling and Production Technology, 2022,46(1):115-119.
    [12] 孙昊,魏子博,陈岑梅,等.探讨如何做好石油钻井机械设备的管理与维护[J].中国石油和化工标准与质量,2021,41(5):81-83.SUN Hao, WEI Zibo, CHEN Cenmei, et al. Discuss how to do oil drilling machinery and equipment management and maintenance[J]. China Petroleum and Chemical Standard and Quality, 2021,41(5):81-83.
    [13] 陈乐强.简析石油钻井机械设备保养与维护[J].中国石油和化工标准与质量,2019,39(5):49,51.CHEN Leqiang. Brief analysis on maintenance and maintenance of oil drilling machinery[J]. China Petroleum and Chemical Standard and Quality, 2019,39(5):49,51.
    [14] 高旭东.石油钻井顶驱设备的使用及维护[J].云南化工,2018,45(1):242.GAO Xudong. Use and maintenance of top flooding equipment for petroleum drilling[J]. Yunnan Chemical Industry, 2018,45(1):242.
    [15] 孙永兴,范生林,乔李华.页岩气水平井卡钻主要原因及预防对策[J].天然气工业,2018,38(12):107-113.SUN Yongxing, FAN Shenglin, QIAO Lihua. Main reasons and preventive countermeasures for pipe sticking in shale gas horizontal wells[J]. Natural Gas Industry, 2018, 38 (12):107-113.
    [16] 罗志远.一种钻井用顶驱管子处理装置:CN202122034085.3[P].2021-08-25.LUO Zhiyuan. A top drive pipe treatment device for drilling:CN202122034085.3[P].2021-08-25.
    [17] 雷宇,李子良,谢海欢,等.顶驱回转头锁紧系统的优化研究[J].石油机械,2019,47(1):27-31.LEI Yu, LI Ziliang, XIE Haihuan, et al. Optimization of locking system of top drive rotating head[J]. China Petroleum Machinery, 2019,47(1):27-31.
    [18] 白晓捷,谢良伟,赵凯来.40顶驱的技术特性及方便现场应用的一些优化设计[J].中国科技博览, 2015(20):1.BAI Xiaojie, XIE Liangwei, ZHAO Kailai. Technical characteristics of 40 top drive and some optimization designs for convenient field application[J]. China Science and Technology Expo, 2015(20):1.
    Cited by
    Comments
    Comments
    分享到微博
    Submit
Get Citation
Share
Article Metrics
  • Abstract:470
  • PDF: 1223
  • HTML: 877
  • Cited by: 0
History
  • Received:September 27,2023
  • Revised:November 07,2023
  • Adopted:November 08,2023
  • Online: November 29,2023
  • Published: November 10,2023
Article QR Code