Deviation prevention and correction technology for NLSD-1 hole of Nanling Scientific Drilling
CSTR:
Author:
Affiliation:

1.CIGIS (China) Limited, Beijing 100007, China;2.313 Geological Team, Bureau of Geology and Mineral Exploration of Anhui Province, Lu’an Anhui 237010, China

Clc Number:

P634

  • Article
  • | |
  • Metrics
  • |
  • Reference [25]
  • |
  • Related [20]
  • | | |
  • Comments
    Abstract:

    NLSD-1 hole of Nanling Scientific Drilling is located at the intersection of the Wuyi northeast structural belt and the Nanling east-west structural belt in southern Jiangxi. The rock bedding, foliation, structural fractures and cleavage are developed with frequent occurrence of soft and hard interbeds, fracture zones and multiple magmatic rock intrusions in the borehole. These geological factors cause serious natural bending of the borehole. In order to ensure the verticality of the borehole, wireline coring hydraulic hammer drilling and tower wireline core drilling were used to prevent borehole deviation. In case of strong deflecting formation where borehole deviation can not be controlled by borehole deviation prevention technology, directional drilling technology was used together with sidetracking for borehole deviation correction to achieve the purpose of artificial intervention of the borehole trajectory. Analysis and research show that the deviation prevention and correction technology has significant deviation prevention and straight keeping effect in deep hole drilling in complex and strong deflecting stratum.

    Reference
    [1] 朱恒银,蔡正水,王强,等.赣州科学钻探NLSD-1孔施工技术研究与实践[J].探矿工程(岩土钻掘工程),2014,41(6):1-7.ZHU Hengyin, CAI Zhengshui, WANG Qiang, et al. Study and practice of construction technology for Scientific Drilling Hole NLSD-1 in Ganzhou[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2014,41(6):1-7.
    [2] 董树文,李廷栋,陈宣华,等.我国深部探测技术与实验研究进展综述[J].地球物理学报,2012,55(12):3884-3901.DONG Shuwen, LI Tingdong, CHEN Xuanhua, et al. Progress of deep exploration in mainland China: A review[J]. Chinese J. Geophys, 2012,55(12):3884-3901.
    [3] 陈毓川,陈郑辉,曾载淋,等.南岭科学钻探第一孔选址研究[J].中国地质,2013,40(3):659-670.CHEN Yuchuan, CHEN Zhenghui, ZENG Zailin, et al. Research on the site selection of Nanling Scientific Drilling-1[J]. Geology in China, 2013,40(3):659-670.
    [4] 朱忠,宋鸿林,鲍洪均,等.江西于都-宁都一带印支期构造特征[J].东华理工学院学报,2004,27(2):153-157.ZHU Zhong, SONG Honglin, BAO Hongjun, et al. Structural characters of the Indosinian-stage in Yudu-Ningdu area, Jiangxi province[J]. Journal of East China Institute of Technology, 2004,27(2):153-157.
    [5] 郭娜欣,陈毓川,赵正,等.南岭科学钻中与两种岩浆岩有关的矿床成矿系列——年代学、地球化学、Hf同位素证据[J].地球学报,2015,36(6):742-754.GUO Naxin, CHEN Yuchuan, ZHAO Zheng, et al. Metallogenic series related to two types of granitoid exposed in the Nanling Scientific Drill Hole: Evidence from geochronology, geochemistry and Hf isotope[J]. Acta Geoscientica Sinica, 2015,36(6):742-754.
    [6] 赵正,陈毓川,郭娜欣,等.南岭科学钻探0~2000m地质信息及初步成果[J].岩石学报,2014,30(4):1130-1144.ZHAO Zheng, CHEN Yuchuan, GUO Naxin, et al. The geological information and investigation progresses of Nanling Scientific Drilling in the depth between 0 and 2000m[J]. Acta Petrologica Sinica, 2014,30(4):1130-1144.
    [7] 朱恒银,程红文,蔡正水,等.华南于都-赣县矿集区科学钻探选址预研究NLSD-1孔施工技术报告[R].安徽六安:安徽省地质矿产勘查局313地质队,2013.ZHU Hengyin, CHENG Hongwen, CAI Zhengshui, et al. Pre study on site selection of scientific drilling in Yudu-Ganxian ore concentration area, China South. Construction technology report of NLSD-1 hole [R]. Lu’an Anhui: 313 Geological Team, Bureau of Geology and Mineral Exploration of Anhui Province,2013.
    [8] 赵廷严.浅析钻孔弯曲产生的原因及预防纠正措施[J].中国煤炭地质,2009,21(S1):62-63.ZHAO Tingyan. Causation of borehole deviation and measures to prevent and rectify[J]. Coal Geology of China, 2009,21(S1):62-63.
    [9] 刘俊辉,陈跃,李晓东,等.广西向阳坪铀矿床钻探施工技术及改进措施[J].钻探工程,2021,48(8):59-67.LIU Junhui, CHEN Yue, LI Xiaodong, et al. Drilling technology and improvement measures for the Xiangyangping uranium deposit in Guangxi[J]. Drilling Engineering, 2021,48(8):59-67.
    [10] 潘垚.山东黄金西岭勘查区深部勘探孔防斜与纠斜措施[J].探矿工程(岩土钻掘工程),2018,45(3):37-41.PAN Yao. Deviation prevention for deep exploration hole drilling in Shandong Xiling exploration area and the straightening measures[J]. Exploration Engineering(Rock & Soil Drilling and Tunneling), 2018,45(3):37-41.
    [11] 杨泽英,齐力强,崔淑英,等.深孔绳索取心液动锤钻具研制及应用[J].探矿工程(岩土钻掘工程),2017,44(12):66-70.YANG Zeying, QI Liqiang, CUI Shuying, et al. Development and application of wire-line coring hydro-hammer for deep hole[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2017,44(12):66-70.
    [12] 周宗奇,熊家勤,余慎军.SYZX75绳索取心液动锤在破碎地层中的应用[J].中国煤炭地质,2011,23(1):64-65.ZHOU Zongqi, XIONG Jiaqin, YU Shenjun. Application of wire-line coring hydraulic hammer in crumbling strata[J]. Coal Geology of China, 2011,23(1):64-65.
    [13] 赵铁峰,陈显,韩栋材,等.SYZX75绳索取芯液动锤在邦山铁矿勘探中的应用[J].西部探矿工程,2014,26(3):51-54,66.ZHAO Tiefeng, CHEN Xian, HAN Dongcai, et al. Application of SYZX75 rope core hydraulic hammer in exploration of Bangshan iron mine[J]. West-China Exploration Engineering, 2014,26(3):51-54,66.
    [14] 蔡正水,韩菲.TSZ型塔式绳索取心钻具在复杂地层中的应用[J].地质装备,2016(3):29-32.CAI Zhengshui, HAN Fei. Application of TSZ tower rope coring tool in complex formation[J]. Equipment for Geotechnical Engineering, 2016(3):29-32.
    [15] 邹文洁,陈世和.地浸施工中钻孔弯曲的危害及预防措施[J].铀矿冶,2006,25(4):169-172,185.ZOU Wenjie, CHEN Shihe. Hazards and preventive measures of well deviation in well construction of in-situ leaching[J]. Uranium Mining and Metallurgy, 2006,25(4):169-172,185.
    [16] 宋传祥,贾楠生,季文淼,等.定向钻进技术与装备在穿层定向长钻孔中的应用[J].钻探工程,2021,48(8):83-88.SONG Chuanxiang, JIA Nansheng, JI Wenmiao, et al. Application of directional drilling technology and equipment in cross-bed directional long hole drilling[J]. Drilling Engineering, 2021,48(8):83-88.
    [17] 白刚.煤矿井下定向钻孔超长套管下放技术[J].钻探工程,2021,48(6):57-62.BAI Gang. RIH of over-long casing in underground directional boreholes in coal mines[J]. Drilling Engineering, 2021,48(6):57-62.
    [18] 辛亮.致密砂岩油藏水平井低摩阻导向钻具组合优选[D].西安:西安石油大学,2017.XIN Liang. Optimization of low drag-steering hole assembly for horizontal wells in tight sandstone reservoirs[D]. Xi’an: Xi’an Shiyou University, 2017.
    [19] 韩明耀,柳硕林,王朝晖,等.河南省板厂矿区小直径螺杆钻定向纠斜技术[J].探矿工程(岩土钻掘工程),2019,46(3):36-41.HAN Mingyao, LIU Shuolin, WANG Zhaohui, et al. Deviation correction drilling with slim hole mud motorin Henan Banchang Mining area[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2019,46(3):36-41.
    [20] 向军文,陈晓林,胡汉月.定向造斜及水平钻进连续取心技术[J].探矿工程(岩土钻掘工程),2007(9):33-36.XIANG Junwen, CHEN Xiaolin, HU hanyue. Continuous coring technology in inclination drilling & horizontal drilling[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2007,34(9):33-36.
    [21] 李旭.定向钻井技术进展研究[J].西部探矿工程,2021,33(3):28-29,34.LI Xu. Research on the progress of directional drilling technology[J]. West-China Exploration Engineering, 2021,33(3):28-29,34.
    [22] 吴翔,杨凯华,蒋国盛.定向钻进原理与应用[M].武汉:中国地质大学出版社,2006.WU Xiang, YANG Kaihua, JIANG Guosheng. Principle and Application of Directional Drilling[M]. Wuhan: China University of Geosciences Press, 2006.
    [23] 程红文.定向钻进及随钻测量技术在充填孔施工中的应用[J].探矿工程(岩土钻掘工程),2015,42(6):11-16.CHENG Hongwen. Application of directional drilling and MWD technology in the filling hole construction[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2015,42(6):11-16.
    [24] 姚宁平.我国煤矿井下近水平定向钻进技术的发展[J].煤田地质与勘探,2008,36(4):78-80.YAO Ningping. Development trend of nearly horizontal directional drilling technology in coal mines of China[J]. Coal Geology & Exploration, 2008,36(4):78-80.
    [25] 施明兴,高贵荣.江西于都银坑矿田银金铅锌矿床地质特征[J].资源调查与环境,2006,27(2):164-172.SHI Mingxing, GAO Guirong. Geological character istics of Ag、Au、Pb and Zn deposits in Yinkeng ore field, Jiangxi[J]. Resources Survey & Environment, 2006,27(2):164-172.
    Cited by
    Comments
    Comments
    分享到微博
    Submit
Get Citation
Share
Article Metrics
  • Abstract:712
  • PDF: 1150
  • HTML: 1160
  • Cited by: 0
History
  • Received:January 23,2022
  • Revised:April 16,2022
  • Adopted:April 24,2022
  • Online: May 27,2022
  • Published: May 10,2022
Article QR Code