Research and application of curtain forming and controlled grouting technology for overburden with pressurized flow water
CSTR:
Author:
Affiliation:

1.Guodian Danba Donggu River Hydropower Development Co., Ltd., Danba Sichuan 626300, China;2.Sichuan Gotone Geotechnical Technology Co., Ltd., Chengdu Sichuan 610091, China;3.PowerChina Vibroflotation Construction Engineering Co., Ltd., Beijing 100102, China

Clc Number:

TV543

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    During the process of grouting for seepage treatment of dam foundation overburden under some water head when retaining water, problems such as slurry dispersing, incomplete curtain, large consumption of cement, may be encountered. In reference to field practice, this paper investigates the use of the anti-washout slurry and the paste-like slurry, the injection-after-sealing principle, and grouting in tiers of different types of slurry for the upstream and downstream to solve the technical problems related to grouting of the overburden anti-seepage curtain and control of grouting under pressurized flow water. The technology produced good field results and can provide important reference for similar seepage treatment.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 31,2021
  • Revised:July 07,2021
  • Adopted:July 20,2021
  • Online: December 31,2021
  • Published: December 10,2021
Article QR Code