4/6/2025, 2:14:39 AM 星期日
Slide analysis and control of jack-up rig during repeat placement
CSTR:
Author:
Affiliation:

1.Shanghai Branch of CNOOC Ltd., Shanghai 200335, China;2.CNOOC Energy Technology & Service Limited, Tianjin 300452, China

Clc Number:

TE951

  • Article
  • | |
  • Metrics
  • |
  • Reference [16]
  • |
  • Related [20]
  • | | |
  • Comments
    Abstract:

    With the continuous development of exploration and development in the Xihu area, the number of jack-up drilling platforms in the East China Sea is also increasing. Due to the influence of typhoon and multiple operations in the same location, the jack-up drilling platform will inevitably repeat the operation near their previous position, and cause the pile shoe slide phenomenon; thus leading to the decrease of cantilever operation range when in place, and failure to meet the needs of drilling operation. In the worse case, it may even affect the structural safety of the platform, resulting in engineering accidents with high operation risk. Taking the pile shoe of H9 jack-up drilling platform as an example, this paper analyzes the mechanical characteristics of the pile shoe under partial coincidence conditions, studies the failure mode of seabed soil, and puts forward horizontal force calculation models of the pile shoe in different types of soil. The finite differential method of the slide line is used to calculate the ultimate bearing capacity of the pile shoe. This paper analyzes the measures taken during H9 platform repeat placement, with a series of safety control measures put forward according to the requirements of offshore operation, which can provide a reference for safe and efficient jack-up rig repeat placement.

    Reference
    [1] 张爱霞.方形桩靴自升式平台地基极限承载力及结构抗穿刺研究[D].大连:大连理工大学,2013.ZHANG Aixia. On ultimate bearing capacity of jack-up with spudcan and application to structure investigation against punch-through[D]. Dalian: Dalian University of Technology, 2013.
    [2] 方长传.自升式钻井平台调整井作业精确就位技术研究与应用[J].中国海上油气,2013,25(4):42-45.FANG Changchuan. Research and application of precise positioning technology of jackup platform for adjustment wells[J]. China Offshore Oil and Gas, 2013,25(4):42-45.
    [3] 宋宝杰.海上自升式工程地质勘察平台的设计与应用[J].探矿工程(岩土钻掘工程),2020,47(7):36-40.SONG Baojie. Design and application of the marine jack-up platform for geo-investigation[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2020,47(7):36-40.
    [4] 刘阳.自升式平台滑移问题及对平台结构影响分析[D].北京:中国石油大学(北京),2017.LIU Yang. Jack-up sliding and its influence on platform structure[D]. Beijing: China University of Petroleum, 2017.
    [5] 刘阳,冮鹏,赵少伟,等.“老脚印”对自升式钻井平台插桩滑移的影响研究[J].探矿工程(岩土钻掘工程),2018,45(6):40-46.LIU Yang, GANG Peng, ZHAO Shaowei, et al. Influence of “Old Footprints” on pile slip of self-elevating drilling platform[J]. Exploration Engineering (Rock & Soil Drilling and Tunneling), 2018, 45(6): 40-46.
    [6] 赵景芳.自升式平台桩靴滑移实时监测技术研究——以罗布雷300型平台为例[J].中国海上油气,2014,26(1):92-95.ZHAO Jingfang. Real time monitoring method research on jack-up spudcan sliding: A case of RobrayR300 rig[J]. China Offshore Oil and Gas, 2014,26(1):92-95.
    [7] GAN C T, LEUNG C F, CHOW Y K. A study on spud can footprint1[R].6th Southeast Asia Geotechnical Conf, Kuala Lumpur, 2007:735-740.
    [8] 叶洪东,孙红月,要明伦.海洋移动式桩基钻井平台重复就位时滑移的计算与分析[J].中国海洋平台,1999,14(3):17-22.YE Hongdong, SUN Hongyue, YAO Minglun. Analysis and calculation of sliding of jack-up during re-sitting[J]. China Offshore Platform, 1999,14(3):17-22.
    [9] 潘亿勇,齐恒之.自升式悬臂钻井船重返井口就位方式浅析[J].中国海洋平台,2015,30(2):1-3,9.PAN Yiyong, QI Hengzhi. Analysis on positing in the jack-up reentry to the wellhead platform[J]. China Offshore Platform, 2015,30(2):1-3,9.
    [10] 张其一.自升式平台桩基土体变形规律与破坏机理分析[J].中国海洋大学学报(自然科学版),2012,42(11):111-116.ZHANG Qiyi. Analysis of deformation law and failure mechanism of pile foundation of jack-up platform[J]. Periodical of Ocean University of China, 2012,42(11): 111-116.
    [11] 王楠,吴建政,徐永臣,等.单一地层平台插桩地基土破坏模式及插桩深度有限元分析[J].海岸工程,2012,31(4):20-28.WANG Nan, WU Jianzheng, XU Yongchen, et al. Fail mode of foundation soils and finite element limit analysis of penetration depth for jack-up rig footing penetration on single stratum[J]. Coastal Engineering, 2012,31(4):20-28.
    [12] 杜欢欢,彭刚.魏锡克地基承载力计算方法讨论[J].工程建设,2013,45(2):20-28.DU Huanhuan, PENG Gang. Discussion on calculation method of Vesic’s foundation bearing capacity[J]. Engineering Construction, 2013,45(2):20-28.
    [13] 段忠毅,要明伦,王家祥,等.带桩靴自升式桩基钻井平台插桩深度的计算方法[J].中国海上油气(工程),1998,10(4):20-24.DUAN Zhongyi, YAO Minglun, WANG Jiaxiang, et al. Analysis of calculating method of the plug-in depth of pile-based drilling platform[J]. China Offshore Oil and Gas (Engineering), 1998,10(4):20-24.
    [14] 姚首龙.桩靴基础自升式钻井平台在砂土层下伏粘土层中的插桩分析[J].船海工程,2013,42(2):111-114.YAO Shoulong. Spud-can foundation penetration analysis of a jack-up unit in sand layer overlying clay layer[J]. Ship & Ocean Engineering, 2013,42(2):111-114.
    [15] SNAME. Recommended practice for site specific assessment of mobile jack-up unites[M]. Rev.2 Jersey City, NJ: Society of Naval Architects and Marine Engineers, 2002.
    [16] 陈震.散体极限平衡理论基础[M].北京:中国水利水电出版社,1987.CHEN Zhen. Theory of Granular Limit Equilibrium[M]. Beijing: China Water & Power Press, 1987.
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 27,2021
  • Revised:September 06,2021
  • Adopted:September 06,2021
  • Online: December 31,2021
  • Published: December 10,2021
Article QR Code