Application of PDM drilling technology in Well-GR1 drilling in hot dry rock
CSTR:
Author:
Affiliation:

1.Shandong Lunan Geological Engineering Survey Institute (The Second Geological Brigade of Shandong;Geological Survey Bureau), Jining Shandong 272100, China;2.China University of Geosciences, Wuhan Hubei 430074, China

Clc Number:

P634;TE242

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper introduces the application of composite drilling technology of rotary (top drive) drilling and PDM drilling in hot dry rock Well-GR1 in Gonghe Basin, Qinghai so as to improve hot dry rock drilling efficiency and reduce downhole incidents. According to the working characteristics of the PDM drill under high downhole temperature, optimization was conducted of the high temperature resistance rubber, as well as the clearance between the stator and rotor of the PDM drill. It was tested for drilling of the high temperature hot dry rock well (hole depth of 3705m, hole bottom temperature 236℃) for the first time and was successful. It can provide experience for hot dry rock drilling and deep geothermal resource exploration.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 23,2020
  • Revised:October 13,2020
  • Adopted:October 14,2020
  • Online: March 10,2021
  • Published: February 10,2021
Article QR Code