Wire-line core drilling technology of ultra-long horizontal investigation boreholes for the Sichuan-Tibet Railway
CSTR:
Author:
Affiliation:

1.Jinzuan Company of Team 402, Sichuan Bureau of Geology & Mineral Resources, Chengdu Sichuan 611743, China;2.China Railway Eryuan Engineering Group Co., Ltd., Chengdu Sichuan 610031, China

Clc Number:

P634;U452.1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The newly-built Sichuan-Tibet Railway passes through the Western Sichuan Plateau. Precipitous topography, vulnerable ecology and poor traffic conditions of the region bring about many obstacles for carrying out investigation drilling, especially for lots of extra-long deep tunnels. Horizontal core drilling is one of the important means for investigation for tunnels. In view of these conditions, the original design of the portable drilling rig EP600Plus will face such problems as inability to drill horizontal boreholes, high drilling resistance, low coring efficiency due to frequent high-pressure water gushing. With flexible application of various methods including drill upgrading, process innovation, supply of auxiliary equipment, and building access bridges and roads with steel pipes for the first time as environment protection measures,use wire-line core drilling technology, a horizontal coring borehole was completed at depth of 903.28m with a full technical plan established and proven with application. The main achievements can provide important reference for similar investigation projects.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 27,2020
  • Revised:May 13,2020
  • Adopted:June 18,2020
  • Online: May 14,2021
  • Published: May 10,2021
Article QR Code