Design and application of the marine jack-up platform for geo-investigation
CSTR:
Author:
Affiliation:

The Third Geological Team of Shandong Bureau of Geology and Mineral, Yantai Shandong 264004, China

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The floating work platform is greatly affected by weather, wave, tide and other natural factors; thus, construction needs to be done according to the weather window period. It is not suitable for projects with the tight construction period, long operation period and high technical requirements. The jack-up platform designed in this papernot only has the advantages of floating working platforms, refitted barges and other construction platforms, but also has the self-elevation function by which the deck can leave the sea level to avoid the influence of meteorologicaland environmental factors to the greatest extent, effectively extend the construction window period, and improve work efficiency during the construction period; at the same time, the stable marine work platform greatly improves the accuracy of data parameter acquisition.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 13,2020
  • Revised:June 24,2020
  • Adopted:June 28,2020
  • Online: August 13,2020
  • Published:
Article QR Code