Normal injection and reverse squeeze displacement process for lost return leakage in RIH of casing
CSTR:
Author:
Affiliation:

1.Fifth Geological Exploration Institute of Heilongjiang Province, Harbin Heilongjiang , China;2.SINOPEC Huabei Oilfield Service Corporation Wupu Drilling Branch, Xinxiang Henan , China

Clc Number:

TE256;P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In Liuyangbao Gas Field, lost return leakage generally occurs in the horizontal well during running casing through the horizontal section. This is mainly reflected in the fact that drilling slurry will not return out of the well when casing is set from 2800 to 3100m, though staged circulation is adopted. In the field, casing was directly run to the bottom of the well, and then the normal injection and reverse squeeze displacement method was used to establish circulation to ensure normal cementing. The method has solved effectively the problem of lost circulation in casing cementing, and provides solution for the similar situation in other blocks.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 02,2019
  • Revised:April 27,2020
  • Adopted:April 27,2020
  • Online: June 04,2020
  • Published:
Article QR Code