Numerical simulation analysis of foundation pit dewatering at Yangzhong Jinyuan Times Shopping Center
DOI:
CSTR:
Author:
Affiliation:

1.Jiangsu Geological Foundation Pile Engineering Co., Ltd., Zhenjiang Jiangsu 212000, China; 2.School of Architecture and Civil Engineering, Jiangsu University of Science and Technology, Zhenjiang Jiangsu 212000, China; 3.The Fifth Geological Brigade of Hebei Bureau of Geology and Mineral Resources Exploration, Tangshan Hebei 063000, China

Clc Number:

TU41

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Proper foundation pit dewatering will have an important impact on the foundation pit excavation and the surrounding environment, so it is necessary to evaluate the foundation pit dewatering plan. In view of the problem of foundation pit dewatering at Yangzhong Jinyuan Times Shopping Center, MIDAS/GTS was utilized to study the effect of foundation pit dewatering. Firstly, according to the soil permeability coefficient provided in the geological survey report, in combination with the single well and double well pumping test results, the soil permeability coefficient and boundary functions required in the MIDAS/GTS were inverted. Then, with the parameters obtained from the inversion, a 3D analytical model of the foundation pit dewatering effect was established with consideration of the recharge effect of the backfilling well for simulation of the relationship between the water level drawdown and the time in the foundation pit any analysis and evaluation of the foundation pit dewatering effect, providing guide for earthwork excavation.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 08,2019
  • Revised:March 06,2019
  • Adopted:March 18,2019
  • Online: April 16,2019
  • Published:
Article QR Code