1.SINOPEC Huabei Oilfield Service Corporation, Technology Service Company, Zhengzhou Henan 450006, China; 2.SINOPEC Huabei Oilfield Service Corporation, Henan Drilling Company, Nanyang Henan 473000, China
Clc Number:
P634;TE249
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
Adjustment wells are mainly used for improvement of the well pattern through regrouping, and for fine production through subdivision of the payzone at the late development stage of the old oil fields so as to achieve stable or higher productivity. With the existing injectionproduction system and production status, the cement quality of the adjustment wells cannot ensure effective sealing between layers due to the complex formation pressure system and diverse formation fluid compositions. Based on the analysis of various technical difficulties faced by adjustment well cementation and their effects on cementing quality, this paper summarizes the existing problems with the cementing quality and the main technical measures to improve it at present, and put forward the technical measures and research directions to be taken in the next step, which lay a technical foundation for improving the cementing quality of adjustment wells.