Curtain grouting at No. Ⅰ ore body of Great Wall Gold Mine in Qian’an
CSTR:
Author:
Affiliation:

Geological Team 217, Shanxi Provincial Geological Prospecting Bureau, Datong Shanxi 037008, China

Clc Number:

TD745

  • Article
  • | |
  • Metrics
  • |
  • Reference [5]
  • |
  • Related [17]
  • | | |
  • Comments
    Abstract:

    The curtain grouting project of No. Ⅰ ore body of Great Wall Gold Mine in Qian’an is a large scale water cut off project, characterized by its extensive scope, large quantity of designed boreholes, complex geologic conditions , large volume of grouting and long construction period. This paper elaborates the principle and procedure of curtain grouting, summarizes its construction features and rules, and analyzes its application effect.

    Reference
    :[1] 苏丛雄、高英强.迁安市长城金矿Ⅰ号矿体帷幕注浆堵水工程施工方案[R],山西大同,山西省第十地质工程勘察院,2017
    [2] 苏丛雄,高英强、徐立等.迁安市长城金矿Ⅰ号矿体帷幕注浆堵水工程总结报告,[R],山西大同,山西省第十地质工程勘察院,2018
    [3] 张永成.注浆技术[M],煤炭工业出版社,2017
    [4] 王雨利,王晓蕾. 破碎围岩注浆加固技术及其工程应用[M],中国矿业大学出版社,2013
    [5] 罗平平. 岩体注浆理论与数值分析[M],黄河水利出版社,2017
    Cited by
    Comments
    Comments
    分享到微博
    Submit
Get Citation
Share
Article Metrics
  • Abstract:1278
  • PDF: 989
  • HTML: 261
  • Cited by: 0
History
  • Received:December 20,2018
  • Revised:April 09,2019
  • Adopted:April 16,2019
  • Online: June 20,2019
Article QR Code