Deviation correction drilling with slim hole mud motorin Henan Banchang Mining Area
DOI:
CSTR:
Author:
Affiliation:

The First Geological Exploration Institute of Henan Provincial Bureau of Geo-exploration andMineral Development

Clc Number:

P634.7

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    With analysis of the existing drilling information of Hole ZK1403 in Henan Banchang Mining Area, a deviation correction plan was determined according to the geological requirements of directional deviation correction. An effective directional deviation correction process with the slim hole mud motor was developed in terms of deviation correction drilling theory with the slim hole mud motor, drilling equipment, instruments, drilling procedure and drilling parameters. Successful deviation correction was achieved from the hole depth 958m, inclination 10° and azimuth 143° to the hole depth 1100m, inclination 7° and azimuth 18°. Based on the correction results in the mining area, both the advantages and disadvantages of the process were summarized, providing reference for deviation correction in deep geological hole drilling.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 17,2018
  • Revised:September 16,2018
  • Adopted:January 08,2019
  • Online: March 14,2019
  • Published:
Article QR Code