Sidetracking Horizontal Drilling Technology in Well DB2-E5 of Dongpang Coal Mine
DOI:
CSTR:
Author:
Affiliation:

9th Geological Brigade, Hebei Bureau of Geology and Mineral Resources Exploration

Clc Number:

P634.7

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    DB2-E5 is the first sidetracking horizontal well for grouting in Dongpang. This paper analyzes the drilling difficulties, presents the well structure desigh and branch well design trajectory and introduces the real drilling technical measures and DHA as well as drilling parameters in detail. The successful completion of this well is of great significance for Ordovician grouting, waterproofing, water control and drilling cost reduction.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 12,2018
  • Revised:June 19,2018
  • Adopted:June 19,2018
  • Online: August 07,2018
  • Published:
Article QR Code