Abstract:With the breakage of ore-bearing layer in Yangshishan gold deposite prospecting drilling in Yunnan, but coring reqirements are high, low core recovery rate and frequent downhole accidents often happen when drilling using 110mm single pipe. A set of drilling technology which combines 110mm single pipe drilling with 95mm wire-line coring is explored, the drilling difficulties in fractured ore bearing layers are solved and core recovery rate is ensured.