Drilling and Construction Technique of DZK1 Geothermal Exploration Hole in Quanzhou
DOI:
CSTR:
Author:
Affiliation:

Fourth Geological Brigade of Fujian Province

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The geothermal exploration hole (combined hole of exploration and mining) is an exploratory construction on the basis of the mining construction technology. This paper mainly introduces the construction problems encountered in the drilling construction and the application of new technology and new process, such as large diameter single pipe coring, well washing by air compressor combined with piston, lowing casings by every other grade, drill pipe tightness test for every 50m since drilling depth of 800m, drill bit sharpening by putting stones into the borehole and drilling in large water inflow formation.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 26,2018
  • Revised:July 20,2018
  • Adopted:August 01,2018
  • Online: November 19,2018
  • Published:
Article QR Code