    Abstract:

    The poor cementing quality occurred in some high pressure salt-gypsum layer of Missan oilfield is analyzed together with the influence on the next operation are analyzed, the design of preflush and cement slurry, on-site inspection of casing and liner, borehole requirements before casing running, borehole requirements before cementing, casing eccentricity, cementing by mud grouting & displacing and cementing quality checking are successfully applied in the high pressure salt-gypsum sections of 47 well, which provides a reference for the cementing quality improvement in similar situation.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 04,2018
  • Revised:July 02,2018
  • Adopted:July 05,2018
  • Online: September 30,2018
  • Published:
Article QR Code