Abstract:Based on the comprehensive recovery management of the old mining pits (wells), collapse zone and goaf left in Jinniushan mine of Muping District, this paper introduces the design and construction process of the goaf filling and grouting in detail, by which, the hidden geological hazard is eliminated and the geological environment is improved. The engineering design and the successful practice can provide good guidance and reference for similar treatment projects of gold mine collapse zone and goaf.