Application of VRC Method in Transfixion Construction of 2nd Chute in Open Pit Mining Field of Zijinshan Gold-Copper Deposit
DOI:
CSTR:
Author:
Affiliation:

No.313 Unit of Bureau of Geology and Exploration of Anhui Province,Heilongjiang Province Qigihar Mineral Exploration and Development Institute

Clc Number:

TD521 .1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the transfixion construction of 2nd chute in open pit mining field of Zijinshan gold-copper deposit, the paper elaborates in detail the transfixion blasting construction of chute VRC method. Considering the influence of blasting time limit, a feasible solution was proposed. By the smooth chute transfixion experience and the analysis on the construction, the attentions for VRC method in chute transfixion blasting operation are summarized.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 07,2017
  • Revised:November 07,2017
  • Adopted:November 27,2017
  • Online: March 15,2018
  • Published:
Article QR Code