Drilling Construction Technology of Well Miaomei-1 of Xinjiang Changji
DOI:
CSTR:
Author:
Affiliation:

The Third Geological Teem of Shandong Bureau of Geology and Mineral

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In geological survey well engineering for CBM resources investigation and evaluation project in Miaoergou area of Changji of Xinjiang, the designed well depth was 2500m, and full borehole coring was required. There are problems of difficult coring, leakage, hole shrinkage and winter construction. By adopting special coring tools, enlarging bit outer diameter and annular clearance, heating with oil heater and some effective measures, the difficulties in drilling technology and logistics supply are effectively solved to provide data for CBM resources investigation and evaluation in this area.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 08,2017
  • Revised:June 12,2017
  • Adopted:June 29,2017
  • Online: September 18,2017
  • Published:
Article QR Code