Engineering Drilling Design Optimization and Drilling Practice of Well Chengtan-1
DOI:
CSTR:
Author:
Affiliation:

rilling Engineering Technology Research Institute of Daqing Drilling & Exploration Engineering Corporation

Clc Number:

TE242;P634.5

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Well Chengtan-1 is the first ultra-deep well over 7000m in Tadong block of Daqing oilfield. Through analyzing the data of the adjacent wells and optimizing the wellbore structure, BHA and drilling fluid system, a bit series suitable for Gucheng block was established. Using China-made hydraulic rotary tools, the difficult drilling speed improvement in “black quilt” formation of Tadong, where a φ241.3mm hole was located, was solved and the drilling cycle was shortened by higher ROP.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:November 10,2016
  • Revised:November 10,2016
  • Adopted:June 09,2017
  • Online: September 18,2017
  • Published:
Article QR Code