College of Construction Engineering, Jilin University,Jilin Provincial Institute of Geo-exploration Techniques,College of Construction Engineering, Jilin University,Jilin Provincial Institute of Geo-exploration Techniques
Clc Number:
P634.3
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
Based on the analysis on the problems of existing mechanical drill pipe holder, in view of the mechanical drill pipe holder’s working reliability and operability, the hinged force-increasing clamping structure is adopted to design a kind of holder with preloaded clamping function, which c52an increase the initial clamping force of gripper and improve the performance of drill pipe holder.