Discussion of Construction Technology for Leakage Formations Treatment with Aerated Mud and Foam Mud
DOI:
CSTR:
Author:
Affiliation:

311 Geology Team, Bureau of Geology and Mineral Exploration of Anhui Province,311 Geology Team, Bureau of Geology and Mineral Exploration of Anhui Province,311 Geology Team, Bureau of Geology and Mineral Exploration of Anhui Province

Clc Number:

P634.6 4

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the complicated long-section well kick & circulation loss, loose and broken formations, the drilling method with foam mud or aerated mud is put forward to balance the formation pressure, which has dual role on wall protection and flushing fluid leakage prevention to realize continuous plugging and wall protection, and is helpful to improve drilling efficiency and reduce cost. This is a new technical means developed for drilling construction in water deficient area and full loss stratum.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 29,2016
  • Revised:November 15,2016
  • Adopted:November 24,2016
  • Online: April 14,2017
  • Published:
Article QR Code