Application Study on Cementing Technology for Absorption Well in Long Horizontal Section of Fuling Shale Gas Well
DOI:
CSTR:
Author:
Affiliation:

Drilling Company 2 of Zhongyuan Petroleum Engineering Co., Ltd., SINOPEC,Drilling Company 2 of Zhongyuan Petroleum Engineering Co., Ltd., SINOPEC,Drilling Company 2 of Zhongyuan Petroleum Engineering Co., Ltd., SINOPEC

Clc Number:

TE256

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Various types of lost circulation occured frequently in Fuling shale gas well drilling, which seriously impacted the engineering quality, especially the oil-based drilling fluid leakage happened in the third segment of long horizontal section and even in cementation stage, both cementation quality and late shale gas exploitation were affected. In view of the characteristics of absorption well, a series of borehole preparation techniques, high performance fiber, spacer fluid plugging, optimal outside pipe slurry column structure, wall stability under pressure for absorption well cementation were studied to improve plugging performance and cementation quality. With enlargement of the exploitation area, the geological conditions will be more complicated, the paper puts forward the further research direction and the suggestion.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 14,2016
  • Revised:June 14,2016
  • Adopted:June 17,2016
  • Online: July 19,2016
  • Published:
Article QR Code