Xuzhou Xugong Foundation Construction Machinery Co., Ltd.,Xuzhou Xugong Foundation Construction Machinery Co., Ltd.,Xuzhou Xugong Foundation Construction Machinery Co., Ltd.,Xuzhou Xugong Foundation Construction Machinery Co., Ltd.
Clc Number:
TU476.3
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
Rock-embedding is more and more required in diaphragm wall engineering. According to the low rock embedding efficiency of the grab widely used at this stage, take the characteristics of grabbed formation as the starting point, the analysis was made on the reasons of low rock embedding efficiency; with rock fragmentation theory as theoretical basis, some improvement suggestions were put forward in the grab weight, cylinder closing force, bucket teeth arrangement and grabbing mode.