Drilling Construction Organization and Technical Management in Yangzhai Coal Mine of Guizhou
DOI:
CSTR:
Author:
Affiliation:

Geological Team 102, Guizhou Bureau of Geology and Mineral Resources,Geological Team 102, Guizhou Bureau of Geology and Mineral Resources,Geological Team 102, Guizhou Bureau of Geology and Mineral Resources,Geological Team 102, Guizhou Bureau of Geology and Mineral Resources

Clc Number:

P634.8

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In the prospecting drilling construction project in complex formation of Yangzhai coal mine in Qianlong of Guizhou, the construction organization and management were carried out in the aspects of job responsibilities clarifying, detailed management procedures, strict examination of admittance conditions of construction team, selection of drilling methods and wall protection measures, proper use of flushing fluid and proper drilling operation, serious professional technical training, technical explanation before construction and technical instruction in the construction process. In this case, technical difficulties of collapsing while drilling in high gas and water gushing coal strata were overcome, the very difficult drilling project was completed successfully.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 26,2015
  • Revised:May 07,2015
  • Adopted:June 25,2015
  • Online: July 27,2015
  • Published:
Article QR Code