Drilling Technology of TLSJD-1 in Tongling Scientific Drilling
DOI:
CSTR:
Author:
Affiliation:

321 Geological Team,Bureau of Geology and Mineral Exploration of Anhui Province,321 Geological Team,Bureau of Geology and Mineral Exploration of Anhui Province,321 Geological Team,Bureau of Geology and Mineral Exploration of Anhui Province,Wuxi Drilling Tools Co.,Ltd.

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    TLSJD-1 is located in middle-lower Yangtze area. According to the general geology and construction requirements, proper construction organization and scientific and effective construction techniques were adopted. Deflection by screw motor was used for times in the construction to deal with the serious natural whipstocking. With self-developed 5-element drill tool to stabilize hole deviation, drilling trajectory was effectively controlled. In order to solve the instability of hole wall for open drilling of large section of mud shale in deep hole, under the condition of construction water with high salinity, a set of drilling fluid technology was summarized to ensure the smooth progress of the construction.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 08,2014
  • Revised:January 03,2015
  • Adopted:March 09,2015
  • Online: April 10,2015
  • Published:
Article QR Code