    Abstract:

    Based on the case of the treatment for mined-out area underlying a substation in Datong, the paper introduces the selection and implementation processes of the treatment methods for mined-out area treatment, discusses the design idea of the grouting reinforcement engineering and summarizes the solutions for various difficulties encountered in the construction with the successful experience presented.