Abstract:Based on the water drilling practice of geotechnical engineering investigation in the second phase of Beijing subway Line 6 project, this article introduces the oil drum raft drilling platform on the waters about its structure, features and scope of application. The design principle, design method and establishing plan are discussed and the safety measures of water drilling are summarized.