Shanxi Province No.3 Institute of Hydrogeology and Engineering Geology Investigation,Shanxi Province No.3 Institute of Hydrogeology and Engineering Geology Investigation
Clc Number:
TU991.12
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
With the engineering case of waterstop scheme for a deep well with large water level difference and the implementation effect, the detailed analysis is made on in-tube grouting, out-tube grouting, liner tube cementing, the same diameter cement bridging and pressure relief drilling methods and the experience is summarized.