Discussion on Optimization of Reaming Grading Design of Large Diameter Gas Drainage Well Construction
DOI:
CSTR:
Author:
Affiliation:

Coalfield Geology Bureau of Henan Province,Coalfield Geology Bureau of Henan Province

Clc Number:

P634

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Being confined to the capacity of existing drilling equipments, usually “pilot drilling hierarchical reaming” construction method is used for gas drainage well. By the analysis and calculation of the rotary torque required by reaming, the discussion is made on reaming grading design of the common used large diameter gas drainage well.