Application of Unboned Pre-stressed Anchor Cable in Reinforcement for Dr2 Dangerous Rocks in Suofengying Hydropower Station of Wujian
DOI:
CSTR:
Author:
Affiliation:

Sinohydro Foundation Engineering Co., Ltd.,Sinohydro Foundation Engineering Co., Ltd.,Sinohydro Foundation Engineering Co., Ltd.

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Difficulties of large height difference of construction surface, small working site and complicated formations of dangerous rock exist in Suofengying hydropower station of Wujiang project with several fracture zones distributing in the mountain, the borehole must be drilled through fractures. The paper introduces the special construction technology used in upper anchor cable construction for Dr2 dangerous rocks in Suofengying hydropower station, where it has 110~134.5m height difference to the lowest platform.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:March 28,2014
  • Revised:July 18,2014
  • Adopted:July 28,2014
  • Online: November 13,2014
  • Published:
Article QR Code