Drilling Technology in Deep Sandy Gravel Overburden Layer at Brahmaputra River
DOI:
CSTR:
Author:
Affiliation:

Changjiang Geotechnical Engineering Corporation 〈Wuhan〉,Changjiang Geotechnical Engineering Corporation 〈Wuhan〉,Changjiang Geotechnical Engineering Corporation 〈Wuhan〉,Changjiang Geotechnical Engineering Corporation 〈Wuhan〉,Changjiang Geotechnical Engineering Corporation 〈Wuhan〉,Changjiang Geotechnical Engineering Corporation 〈Wuhan〉,Changjiang Geotechnical Engineering Corporation 〈Wuhan〉

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to carry out the comprehensive planning in Brahmaputra Basin and monographic study on water resources development and conservation, 4 boreholes with depth of 200~300m were laid out in Lilong dam site and Benzong dam site of Brahmaputra main stream. This paper discusses the exploration and hole-building processes in deep overburden layer of alpine region in Tibet based on the successful experience obtained in the above 4 boreholes drilling.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:February 10,2014
  • Revised:April 14,2014
  • Adopted:April 18,2014
  • Online: August 26,2014
  • Published:
Article QR Code