    Abstract:

    By the construction practice of parameter well for shale gas, the situation of multilevel wire-line coring technology by coalfield drilling rig applied in parameter well for shale gas is summarized, and the key construction technologies in water sensible stratum are discussed.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 09,2014
  • Revised:September 20,2014
  • Adopted:November 13,2014
  • Online: December 03,2014
  • Published:
Article QR Code