Discussion on Drilling Project Construction Management
DOI:
CSTR:
Author:
Affiliation:

No.313 Geological Team, Bureau of Geology and Mineral Exploration of Anhui Province,No.3 Geology Team of Shandong Provincial Geo-mineral Bureau,China Chemical Geology and Mine Bureau Shandong Geological Prospecting Institute

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The communication inconvenience of drilling construction environment far away from the people has been disturbing the effective production management. Extensive management, management consciousness absence and nonstandard management have caused a lot of major safety and quality accidents. Combined with the drilling project and based on the theory of project management, the analysis is made to explore a set of management mode suitable for the field engineering construction in geological prospecting industry in China.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 22,2013
  • Revised:August 22,2013
  • Adopted:November 18,2013
  • Online: February 26,2014
  • Published:
Article QR Code