Shield Operation in the Large Slope and Small Radius Curve Segment and the Research on Rectification Construction Control
CSTR:
Author:
Affiliation:

China Railway Eighteen Bureau Group Fourth Engineering Co., Ltd.

Clc Number:

U455.42

  • Article
  • | |
  • Metrics
  • |
  • Reference [5]
  • |
  • Related [3]
  • | | |
  • Comments
    Abstract:

    According to the comprehensive problem of large slope and small radius curve in the construction of a shield interval of Tianjin metro line 3, by the use of variety of data accumulated in the construction process, with the stress analysis and mathematical statistics, the analysis is made on the influence of the variety of data to shield tunneling, and the discussion is made on the shield tunneling operation and rectification technology. It is realized that the correct analysis on the thrust force and direction, the articulated structure and correction curve setting in the special curve segment is the focus for shield operation and rectification in large slope and small radius curve segment.

    Reference
    [1]胡军凯.浅析盾构过小半径曲线段施工技术.隧道与地下工程,2010,3(5):106-108.
    [2]董宇.浅析盾构机过小半径曲线段的操作与纠偏.交通科学与工程,2010,2(6).
    [3]胡新朋,孙谋,王俊兰.盾构隧道穿越既有建筑物施工应对技术.现代隧道技术,2006,(6):60-64.
    [4]吴波,阳军生、岩土隧道全断面掘金机施工技术[M]、安徽:安徽科学技术出版社、2008、137~140.
    [5]周文波、盾构法隧道施工技术及应用[M]、北京:中国建筑工业出版社、2004、312~315.
    Cited by
    Comments
    Comments
    分享到微博
    Submit
Get Citation
Share
Article Metrics
  • Abstract:987
  • PDF: 1135
  • HTML: 192
  • Cited by: 0
History
  • Received:August 05,2013
  • Revised:August 08,2013
  • Adopted:September 10,2013
  • Online: October 08,2013
Article QR Code