Technical Difficulties of Thick Overburden Layer Drilling in Xiaoqinling Gold Mine and the Countermeasures
DOI:
CSTR:
Author:
Affiliation:

No.3 Geological Exploration Institute, Henan Provincial Bureau of Geo-exploration and Mineral Development,No.3 Geological Exploration Institute, Henan Provincial Bureau of Geo-exploration and Mineral Development,No.4 Geological Exploration Institute, Henan Provincial Bureau of Geo-exploration and Mineral Development

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The analysis is made on the technical difficulties of thick overburden layer drilling in Xiaoqinling gold mine; the technical countermeasures are researched to solve the problems in thick overburden layer wire-line core drilling in the aspects of drilling methods, borehole structure, wall protection with mud and process measures, which have brought good effects in the practice.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:July 24,2013
  • Revised:July 24,2013
  • Adopted:October 24,2013
  • Online: January 20,2014
  • Published:
Article QR Code