Drilling Technology of Over-thick Overburden Layer Drilling in Pre-detecting Hole in Henan
DOI:
CSTR:
Author:
Affiliation:

No.1 Geological Team, Henan Provincial Non-ferrous Metals Geological and Mineral Resources Bureau

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    A drill sticking accident caused ZK001 borehole abandonment in Jiaozhuang iron ore area of Henan, the construction technology was improved by using proper equipment and high-quality mud, the final hole with depth of 1115.72m was reached with good technical indexes. Analysis is made on the borehole structure, drilling methods and properties of flushing fluid; the problems appeared in the construction and the countermeasures are briefly discussed.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 04,2013
  • Revised:October 23,2013
  • Adopted:November 07,2013
  • Online: January 02,2014
  • Published:
Article QR Code