Abstract:This paper analyzes the causes of quality accident of high pressure bored pile foundation of a comprehensive building in Xiangyang and introduces the treatment scheme, which is the composite foundation of the original borehole grouting pile and soil between piles with new CFG pile. The practice shows that the scheme is feasible and effective.