China Communications 2nd Navigation Bureau 3rd Engineering Co., Ltd.,Anhui Geotechnical Engineering Co., Ltd., Shanghai Branch,Jiangsu Xingsha Construction Installation Co., Ltd., Shanghai Branch
Clc Number:
TU473.2
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
Based on the analysis and comparison of advantages and disadvantages of traditional deep foundation pit enclosure systems, a new enclosure system was created by combining high-pressure jet grouting curtain with pre-stressed reinforced concrete square pile, which was applied in the projects, and the construction cost was greatly reduced with huge economic benefits.