    Abstract:

    With field cases, the comparison and selection were made on commonly used foundation pit support and water-stop methods; the introduction was made on the double-row piles retaining and high-pressure rotary jet grouting water-stop curtain in saturated sand deep foundation pit. Based on the theoretical calculation and monitoring data, the supporting effect was analyzed, and the application of high-pressure jet grouting water-stop technique was discussed.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:January 05,2013
  • Revised:January 05,2013
  • Adopted:January 22,2013
  • Online: April 23,2013
  • Published:
Article QR Code