Design of Ground Subsidence Management Scheme for Coal Transportation Special Line
DOI:
CSTR:
Author:
Affiliation:

Shaanxi Geological Engineering Corporation,Huangling Mining Co., Ltd.

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the characteristics of subgrade subsidence of coal transportation special line of Huangling Mining Company at K6 680~800, pre-stressed anchor frame beam and perforated pipe grouting method were suggested to be used for the consolidation of subgrade vertical supporting and retaining structure and the improvement of anti-deformation of subgrade. The paper analyzed the force conditions of vertical supporting and retaining structure and introduced the management scheme design.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 29,2012
  • Revised:December 29,2012
  • Adopted:March 12,2013
  • Online: March 25,2013
  • Published:
Article QR Code