Analysis on Drilling Plugging Technology in Shaanxi and Gansu Work Areas and the Suggestions
DOI:
CSTR:
Author:
Affiliation:

Logging Company of North China Bureau of Petroleum, Sinopec

Clc Number:

TE242

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    With the exploration region expanding, the main problems facing to leakage plugging in Shaanxi and Gansu work areas are the complexity and uncertainty of the geological conditions. Simple, convenient and intuitive real-time monitoring on the leakage layer; in-time evaluation to formation pressure, strength and leakage possibility and the implementation of simple and effective plugging measures have become the key to solve these difficult problems. The bridging mud technology widely used at present can not completely meet the requirements of leakage plugging and reservoir protection. Analysis was made on the drilling leakage causes in Shaanxi and Gansu work areas with the technical measures of lost circulation control.

    Reference
    Related
    Cited by
Get Citation
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 25,2012
  • Revised:February 03,2013
  • Adopted:March 11,2013
  • Online: March 25,2013
  • Published:
Article QR Code